St. George's Road

Project narrative

  • Large Basement Development
  • Structural Alterations
  • 2 storeys extension
  • New roof
  • Internal fit-out
  • Project Manager: IMKO London
  • Designer: OP Architects
  • M&E: Gatwick Park
  • Duration: 78 weeks

IMKO London Ltd
First Floor Studio 5
7/8 Kendrick Mews
South Kensington
London
SW7 3HG

IMKO London © 2018

IMKO London