Warwick Way

Project narrative

  • Change of layout
  • Structural works
  • Mechanical and electrical installations
  • Stainless steel handrail
  • Glass balustrade
  • Wood flooring throughout
  • New wardrobes with LED lighting
  • Kitchen and bathrooms installation
  • Internal and external decorating
  • Duration: 9 weeks
  • Designer: LCP
  • Client representative: LCP
  • Project Manager: IMKO London
  • M&E: IMKO London

IMKO London © 2019